- Availability & Price
- Search SKU
Filter by attributes
- Configuration
- Connection 1 Size
- Connection 2 Size
- Materials of Construction
- Product Style
- Shape
Filter by manufacturer
Permanent Ferrule Less Tube Fittings - Phastite® Series
*PRODUCT IMAGE IS REPRESENTATIVE PROVIDED BY THE MANUFACTURER. DO NOT MAKE BUYING DECISIONS SOLEY BASED ON THE IMAGE. PLEASE VERIFY SPECIFICATIONS MEET YOUR REQUIREMENTS.
Phastite® is a breakthrough in tube connection systems; its innovative design concept eliminates the costly requirement of welding and combines quick installation with a signal assembly process achieving a tube connector that can be used in applications up to 21,400 psi/1,470 bar. Developed in a range of standard and corrosion resistant alloys to cope with the most demanding environments, from subsea exploration in the north sea to natural gas drilling in Kazakhstan. Phastite® meets all the relevant performance and functional requirements of industry standards. Throughout the development of Phastite®, product performance and integrity were paramount. A rigorous testing program including Thermal Cycling, Shock, Vibration, Helium Leak, Gas Tight and Hydrostatic testing has been completed.
Markets:
• Oil and Gas Offshore
• Oil and Gas Onshore
• Petrochemical
• Chemical
Features/Benefits:
• Reduced Installation Costs
• Simple assembly process
• No need to re-make or re-test
• No welding required
• Reduced tubing costs
• Weight reduction
• No loose parts
• Simple make-up
• Vibration tolerant
• No need for hot work
Applications:
• Instrumentation lines
• Hydraulic power units
• Chemical injection skids
Read More...Markets:
• Oil and Gas Offshore
• Oil and Gas Onshore
• Petrochemical
• Chemical
Features/Benefits:
• Reduced Installation Costs
• Simple assembly process
• No need to re-make or re-test
• No welding required
• Reduced tubing costs
• Weight reduction
• No loose parts
• Simple make-up
• Vibration tolerant
• No need for hot work
Applications:
• Instrumentation lines
• Hydraulic power units
• Chemical injection skids
| Action | Part No. | Availability | Partner Available | Price | Maximum Operating Pressure | Materials of Construction | Connection Type | Configuration | Tube Outside Diameter | Assembly Time | Minimum Operating Temperature | Shape | Application | Specifications Met | Division | Maximum Operating Temperature | Fitting Type | Connection 1 Size | Connection 2 Size | Configuration | Materials of Construction | Product Style | Connection 1 Size | Connection 2 Size | Shape |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| PH-M10-6R-TFS-625 | Quote Required | TBD | 22500 | Alloy 625 | Termination | Tube to Pipe | 25.0 | < 2 Minutes | -45 | Straight Female Termination | Hydraulic Power Unit | DNV | Instrumentation Products Division | 93.0 | Ferruleless | 10 | 3/8"-19 | Tube to Pipe | Alloy 625 | Termination Female Straight | 10 mm | 3/8"-19 BSPP | |||
| PH-M10-6R-TFS-825 | Quote Required | TBD | 22500 | Alloy 825 | Termination | Tube to Pipe | 25.0 | < 2 Minutes | -45 | Straight Female Termination | Hydraulic Power Unit | DNV | Instrumentation Products Division | 93.0 | Ferruleless | 10 | 3/8"-19 | Tube to Pipe | Alloy 825 | Termination Female Straight | 10 mm | 3/8"-19 BSPP | |||
| PH-M10-6R-TFS-SD | Quote Required | TBD | 22500 | Super Duplex | Termination | Tube to Pipe | 25.0 | < 2 Minutes | -45 | Straight Female Termination | Hydraulic Power Unit | DNV | Instrumentation Products Division | 93.0 | Ferruleless | 10 | 3/8"-19 | Tube to Pipe | Super Duplex | Termination Female Straight | 10 mm | 3/8"-19 BSPP | |||
| PH-M10-6R-TFS-SS | Quote Required | TBD | 22500 | Stainless Steel | Termination | Tube to Pipe | 25.0 | < 2 Minutes | -45 | Straight Female Termination | Hydraulic Power Unit | DNV | Instrumentation Products Division | 93.0 | Ferruleless | 10 | 3/8"-19 | Tube to Pipe | Stainless Steel | Termination Female Straight | 10 mm | 3/8"-19 BSPP | |||
| PH-M10-6R-TMS-625 | Quote Required | TBD | 22500 | Alloy 625 | Termination | Tube to Pipe | 25.0 | < 2 Minutes | -45 | Straight Male Termination | Top Side Umbilical Termination Unit | DNV | Instrumentation Products Division | 93.0 | Ferruleless | 10 | 3/8"-19 | Tube to Pipe | Alloy 625 | Termination Male Straight | 10 mm | 3/8"-19 BSPP | |||
| PH-M10-6R-TMS-825 | Quote Required | TBD | 22500 | Alloy 825 | Termination | Tube to Pipe | 25.0 | < 2 Minutes | -45 | Straight Male Termination | Hydraulic Power Unit | DNV | Instrumentation Products Division | 93.0 | Ferruleless | 10 | 3/8"-19 | Tube to Pipe | Alloy 825 | Termination Male Straight | 10 mm | 3/8"-19 BSPP | |||
| PH-M10-6R-TMS-SD | Quote Required | TBD | 22500 | Super Duplex | Termination | Tube to Pipe | 25.0 | < 2 Minutes | -45 | Straight Male Termination | Hydraulic Power Unit | DNV | Instrumentation Products Division | 93.0 | Ferruleless | 10 | 3/8"-19 | Tube to Pipe | Super Duplex | Termination Male Straight | 10 mm | 3/8"-19 BSPP | |||
| PH-M10-6R-TMS-SS | Quote Required | TBD | 22500 | Stainless Steel | Termination | Tube to Pipe | 25.0 | < 2 Minutes | -45 | Straight Male Termination | Hydraulic Power Unit | DNV | Instrumentation Products Division | 93.0 | Ferruleless | 10 | 3/8"-19 | Tube to Pipe | Stainless Steel | Termination Male Straight | 10 mm | 3/8"-19 BSPP | |||
| PH-M10-M6-PS-625 | Quote Required | TBD | 22500 | Alloy 625 | Permanent | Tube to Tube | 25.0 | < 2 Minutes | -45 | Straight Drop Size | Hydraulic Power Unit | DNV | Instrumentation Products Division | 93.0 | Ferruleless | 10 | 8 | Tube to Tube | Alloy 625 | 10 mm | 8 mm | Straight - Drop Size | |||
| PH-M10-M6-PS-825 | Quote Required | TBD | 22500 | Alloy 825 | Permanent | Tube to Tube | 25.0 | < 2 Minutes | -45 | Straight Drop Size | Hydraulic Power Unit | DNV | Instrumentation Products Division | 93.0 | Ferruleless | 10 | 8 | Tube to Tube | Alloy 825 | 10 mm | 8 mm | Straight - Drop Size | |||
| PH-M10-M6-PS-SD | Quote Required | TBD | 22500 | Super Duplex | Permanent | Tube to Tube | 25.0 | < 2 Minutes | -45 | Straight Drop Size | Hydraulic Power Unit | DNV | Instrumentation Products Division | 93.0 | Ferruleless | 10 | 8 | Tube to Tube | Super Duplex | 10 mm | 8 mm | Straight - Drop Size | |||
| PH-M10-M6-PS-SS | Quote Required | TBD | 22500 | Stainless Steel | Permanent | Tube to Tube | 25.0 | < 2 Minutes | -45 | Straight Drop Size | Hydraulic Power Unit | DNV | Instrumentation Products Division | 93.0 | Ferruleless | 10 | 8 | Tube to Tube | Stainless Steel | 10 mm | 8 mm | Straight - Drop Size | |||
| PH-M10-PC-625 | Quote Required | TBD | 22500 | Alloy 625 | Permanent | Tube to Tube | 25.0 | < 2 Minutes | -45 | Cross | Hydraulic Power Unit | DNV | Instrumentation Products Division | 93.0 | Ferruleless | 10 | 10 | Tube to Tube | Alloy 625 | 10 mm | 10 mm | Cross | |||
| PH-M10-PC-825 | Quote Required | TBD | 22500 | Alloy 825 | Permanent | Tube to Tube | 25.0 | < 2 Minutes | -45 | Cross | Hydraulic Power Unit | DNV | Instrumentation Products Division | 93.0 | Ferruleless | 10 | 10 | Tube to Tube | Alloy 825 | 10 mm | 10 mm | Cross | |||
| PH-M10-PC-SD | Quote Required | TBD | 22500 | Super Duplex | Permanent | Tube to Tube | 25.0 | < 2 Minutes | -45 | Cross | Remote Operated Vehicle | DNV | Instrumentation Products Division | 93.0 | Ferruleless | 10 | 10 | Tube to Tube | Super Duplex | 10 mm | 10 mm | Cross | |||
| PH-M10-PC-SS | Quote Required | TBD | 22500 | Stainless Steel | Permanent | Tube to Tube | 25.0 | < 2 Minutes | -45 | Cross | Hydraulic Power Unit | DNV | Instrumentation Products Division | 93.0 | Ferruleless | 10 | 10 | Tube to Tube | Stainless Steel | 10 mm | 10 mm | Cross | |||
| PH-M10-PE-625 | Quote Required | TBD | 22500 | Alloy 625 | Permanent | Tube to Tube | 25.0 | < 2 Minutes | -45 | Elbow | Hydraulic Power Unit | DNV | Instrumentation Products Division | 93.0 | Ferruleless | 10 | 10 | Tube to Tube | Alloy 625 | 10 mm | 10 mm | Elbow | |||
| PH-M10-PE-825 | Quote Required | TBD | 22500 | Alloy 825 | Permanent | Tube to Tube | 25.0 | < 2 Minutes | -45 | Elbow | Hydraulic Power Unit | DNV | Instrumentation Products Division | 93.0 | Ferruleless | 10 | 10 | Tube to Tube | Alloy 825 | 10 mm | 10 mm | Elbow | |||
| PH-M10-PE-SD | Quote Required | TBD | 22500 | Super Duplex | Permanent | Tube to Tube | 25.0 | < 2 Minutes | -45 | Elbow | Hydraulic Power Unit | DNV | Instrumentation Products Division | 93.0 | Ferruleless | 10 | 10 | Tube to Tube | Super Duplex | 10 mm | 10 mm | Elbow | |||
| PH-M10-PE-SS | Quote Required | TBD | 22500 | Stainless Steel | Permanent | Tube to Tube | 25.0 | < 2 Minutes | -45 | Elbow | Top Side Umbilical Termination Unit | DNV | Instrumentation Products Division | 93.0 | Ferruleless | 10 | 10 | Tube to Tube | Stainless Steel | 10 mm | 10 mm | Elbow |