- Availability & Price
- Search SKU
Filter by attributes
- Kit Type
- Model Number
- Version
Filter by manufacturer
AK, AKM, AKN Service Kits
*PRODUCT IMAGE IS REPRESENTATIVE PROVIDED BY THE MANUFACTURER. DO NOT MAKE BUYING DECISIONS SOLEY BASED ON THE IMAGE. PLEASE VERIFY SPECIFICATIONS MEET YOUR REQUIREMENTS.
For the maintenance of a carbon adsorber, depending on model, a 12-month service-kit and a DESPAC-package are required.
When the oil-control indicator shows that activated carbon replacement is required, or at least after 12 months operation, this must be carried out. Independent of the level of discolouration in the indicator-tube (P02/ZR), the oil-control indicator must also be replaced.
DESPAC quantities vary depending on the size of the model, please refer to the user guide or service manual to determine the correct quantity required.
For more information or a detailed discussion about your specific requirements please contact Parker or an authorised Parker distributor.
Read More...When the oil-control indicator shows that activated carbon replacement is required, or at least after 12 months operation, this must be carried out. Independent of the level of discolouration in the indicator-tube (P02/ZR), the oil-control indicator must also be replaced.
DESPAC quantities vary depending on the size of the model, please refer to the user guide or service manual to determine the correct quantity required.
For more information or a detailed discussion about your specific requirements please contact Parker or an authorised Parker distributor.
| Action | Part No. | Availability | Partner Available | Price | Contains | Division | Brand | Model Number | Version | Kit Type |
|---|---|---|---|---|---|---|---|---|---|---|
| AKMKIT2 | Quote Required | TBD | 2 x perforated screen with foamed-on gasket. | Gas Separation and Filtration Division EMEA | Zander | AKM 75-115 | Generation 0 | 12 Month's Service | ||
| DESPAC10FD | Quote Required | TBD | Activated carbon in 10 kg pack. Refer to user guide for quantities required per model number. | Gas Separation and Filtration Division EMEA | Zander | AKN/AK | Generation 2 | 12 Month's Service | ||
| DESPAC90AK | Quote Required | TBD | Activated carbon in 90 kg pack. Refer to user guide for quantities required per model number. | Gas Separation and Filtration Division EMEA | Zander | AKN/AK | Generation 2 | 12 Month's Service | ||
| RKA6-A8 | Quote Required | TBD | Element for post-filter (housing-body O-ring included), 2 x perforated screens with foamed-on gasket. | Gas Separation and Filtration Division EMEA | Zander | AKM 6-8 | Generation 1 | 12 Month's Service | ||
| RKSCD-F100/16/VA GASKIT 100 | Quote Required | TBD | Flow-distributor. | Gas Separation and Filtration Division EMEA | Zander | AK 380/500 and AKN 6000/8000 | Generation 2 | Flow-distributor | ||
| RKSCD-F125/16/VA GASKIT 125 | Quote Required | TBD | Flow-distributor. | Gas Separation and Filtration Division EMEA | Zander | AK 600 and AKN 1000 | Generation 2 | Flow-distributor | ||
| RKSCD-F50/16/VA GASKIT 50 | Quote Required | TBD | Flow-distributor. | Gas Separation and Filtration Division EMEA | Zander | AK 120 and AKN 2000 | Generation 2 | Flow-distributor | ||
| RKSCD-F65/16/VA GASKIT 65 | Quote Required | TBD | Flow-distributor. | Gas Separation and Filtration Division EMEA | Zander | AK 150/200 and AKN 2600/3100 | Generation 2 | Flow-distributor | ||
| RKSCD-F80/16/VA GASKIT 80 | Quote Required | TBD | Flow-distributor. | Gas Separation and Filtration Division EMEA | Zander | AK 250/300 and AKN 3800/5000 | Generation 2 | Flow-distributor | ||
| RKSCD-G40/16/AL | Quote Required | TBD | Flow-distributor. | Gas Separation and Filtration Division EMEA | Zander | AKM 10-60 | Generation 1/2/3 | Flow-distributor | ||
| RKSCD-G50/16/AL | Quote Required | TBD | Flow-distributor. | Gas Separation and Filtration Division EMEA | Zander | AKM 75-95 | Generation 1/2/3 | Flow-distributor | ||
| SKA1-A4 | Quote Required | TBD | Element for post-filter (housing-body O-ring included), 2 x perforated screens with foamed-on gasket. | Gas Separation and Filtration Division EMEA | Zander | AKM 1-4 | Generation 2 | 12 Month's Service | ||
| SKA1-A4/3 | Quote Required | TBD | Element for post-filter (housing-body O-ring included), 2 x perforated screens with foamed-on gasket. | Gas Separation and Filtration Division EMEA | Zander | AKM 1-4 | Generation 3 | 12 Month's Service | ||
| SKA6-A7 | Quote Required | TBD | Element for post-filter (housing-body O-ring included), 2 x perforated screens with foamed-on gasket. | Gas Separation and Filtration Division EMEA | Zander | AKM 6-7 | Generation 2 | 12 Month's Service | ||
| SKA6-A7/3 | Quote Required | TBD | Element for post-filter (housing-body O-ring included), 2 x perforated screens with foamed-on gasket. | Gas Separation and Filtration Division EMEA | Zander | AKM 6-7 | Generation 3 | 12 Month's Service | ||
| SKA8 | Quote Required | TBD | Element for post-filter (housing-body O-ring included), 2 x perforated screens with foamed-on gasket. | Gas Separation and Filtration Division EMEA | Zander | AKM 8 | Generation 2 | 12 Month's Service | ||
| SKA8/3 | Quote Required | TBD | Element for post-filter (housing-body O-ring included), 2 x perforated screens with foamed-on gasket. | Gas Separation and Filtration Division EMEA | Zander | AKM 8 | Generation 3 | 12 Month's Service | ||
| VASVPB/K1-K4/08 | Quote Required | TBD | Starting device G1/4i. | Gas Separation and Filtration Division EMEA | Zander | AKM 1-4 | Generation 2/3 | Starting Device | ||
| VASVPB/K6-K7/15 | Quote Required | TBD | Starting device G1/2i. | Gas Separation and Filtration Division EMEA | Zander | AKM 6-7 | Generation 2/3 | Starting Device | ||
| VASVPB/K8/20 | Quote Required | TBD | Starting device G3/4i. | Gas Separation and Filtration Division EMEA | Zander | AKM 8 | Generation 3 | Starting Device |